Archived Projects

The Maryland Public Service Commission (PSC) Case Number refers to the docket number that was assigned by the PSC. All documents filed with the PSC are available at its website www.psc.state.md.us.

CALVERT COUNTY

Dominion Energy Cove Point (PSC Case 9318): The PSC had previously granted a CPCN to construct a 130 MW generating unit, as part of the overall project to allow export of liquefied natural gas from the Cove Point terminal. The Applicant filed for a modification to the CPCN related to air permitting; the Order granting the modification was issued on 4 February 2018 (PSC Case Jacket Item #241).

CECIL COUNTY

SunEast/Freepoint - Chesapeake Solar (PSC Case 9451): 9 MW solar array near Chesapeake City. The Order granting the CPCN became final on 6 April 2018 (PSC Case Jacket Item #33).

CHARLES COUNTY

CPV – St. Charles Natural Gas-Fired Project (PSC Case 9437): Modification for existing 725 MW natural gas-fired project in Charles County. The Order granting the CPCN became final on 16 March 2018 (PSC Case Jacket Item #40).

MD Solar 1 - Shugart Valley Place Solar (PSC Case 9464): 32.5 MW solar array near La Plata. The Order granting the CPCN became final on 21 September 2018 (PSC Case Jacket Item #44).

MD Solar 2 - Ripley Road Solar (PSC Case 9463): 27.5 MW solar array, also near La Plata. The Order granting the CPCN became final on 21 September 2018 (PSC Case Jacket Item #44).

DORCHESTER COUNTY

Urban Grid – Egypt Road Solar (PSC Case 9434): 45.9 MW solar array in the City of Cambridge. The Order granting the CPCN became final on 27 April 2018 (PSC Case Jacket Item #70).

FREDERICK COUNTY

Coronal – LeGore Bridge Solar Center (PSC Case 9429): 20 MW solar array; the Order granting the CPCN became final on 23 March 2018 (PSC Case Jacket Item #65).

QUEEN ANNE’S COUNTY

Urban Grid – Jones Farm Lane Solar (PSC Case 9436): 56.7 MW solar array; the Order granting the CPCN became final on 17 April 2018 (PSC Case Jacket Item #52).